Change Order label

Change Order by Dust Bowl Brewing Company

IPA - American · Turlock, CA, US · 7.0% ABV

Add to compare

Hall Rating

20.07

Very Good. In the top 25% of ranked beers.

Style+

103

3% better than the average IPA - American

In-brewery ranking

#19

Ranked #19 of 405 beers from Dust Bowl Brewing Company

ABV

7.0

About 3686.3x weaker than the average IPA - American (25,803.86%)

BAR

11.50

Beers Above Replacement, before the small-sample boost

OPS+

16.94

BAR plus a quality bonus that grows with popularity

Untappd rating

3.84

From 2,230 ratings

How this Hall Rating is built

Read how we rate
Better than the style floor2.56wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume5.84log of ratings (3.35) plus a boost that shrinks as a beer gets popular
Style scale1.344Puts every style on the same scale, so a perfect beer scores 15
Hall Rating20.07Very Good: top 25% of ranked beers

More from Dust Bowl Brewing Company

See all 405 rated beers
#BeerStyleABVRatingsHall Rating
1.Huckleberry Margarita SeltzerHard Seltzer9.71026.50
2.Strawberry Kiwi Margarita SeltzerHard Seltzer9.51923.85
3.Bee PositiveIPA - Session4.61422.38