
Construction Delay by Pocock Brewing Company
Hall Rating
16.09
Above Average. In the top half of ranked beers.
ABV
8.5
About 1.3x weaker than the average Stout - Russian Imperial (10.7%)
BAR
6.11
Beers Above Replacement, before the small-sample boost
OPS+
9.72
BAR plus a quality bonus that grows with popularity
Untappd rating
3.91
From 121 ratings
How this Hall Rating is built
Read how we rateBetter than the style floor1.55wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume5.48log of ratings (2.08) plus a boost that shrinks as a beer gets popular
Style scale1.894Puts every style on the same scale, so a perfect beer scores 15
Hall Rating16.09Above Average: top half of ranked beers
More from Pocock Brewing Company
See all 125 rated beers| # | Beer | Style | ABV | Ratings | Hall Rating |
|---|---|---|---|---|---|
| 1. | Brown's Blueberry Lemon | Cider - Other Fruit | 6.0 | 16 | 20.68 |
| 2. | Pocock Pineapple Milkshake IPA | IPA - Milkshake | 7.0 | 16 | 20.22 |
| 3. | First 13 W/ Apple Pie | Pale Ale - American | 7.6 | 12 | 20.20 |