
Behind Schedule by Untied Brewing Company
Hall Rating
17.32
Above Average. In the top half of ranked beers.
ABV
4.4
About 1.2x weaker than the average Sour - Other (5.36%)
BAR
8.21
Beers Above Replacement, before the small-sample boost
OPS+
12.60
BAR plus a quality bonus that grows with popularity
Untappd rating
3.77
From 418 ratings
How this Hall Rating is built
Read how we rateBetter than the style floor2.06wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume5.53log of ratings (2.62) plus a boost that shrinks as a beer gets popular
Style scale1.520Puts every style on the same scale, so a perfect beer scores 15
Hall Rating17.32Above Average: top half of ranked beers
More from Untied Brewing Company
See all 207 rated beers| # | Beer | Style | ABV | Ratings | Hall Rating |
|---|---|---|---|---|---|
| 1. | Left In the Dark (BBA With Vanilla) | Stout - Other | 10.2 | 27 | 23.35 |
| 2. | Promises (Root Beer) | Hard Seltzer | 5.6 | 31 | 22.94 |
| 3. | Left In the Dark (BA Coffee & Vanilla) | Stout - Imperial / Double | 10.2 | 37 | 21.88 |