
Behind Schedule with Pineapple, Guava & Mango by Untied Brewing Company
Hall Rating
18.36
Very Good. In the top 25% of ranked beers.
ABV
6.2
About 1.2x stronger than the average Sour - Other (5.36%)
BAR
6.74
Beers Above Replacement, before the small-sample boost
OPS+
10.78
BAR plus a quality bonus that grows with popularity
Untappd rating
3.91
From 104 ratings
How this Hall Rating is built
Read how we rateBetter than the style floor2.20wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume5.49log of ratings (2.02) plus a boost that shrinks as a beer gets popular
Style scale1.520Puts every style on the same scale, so a perfect beer scores 15
Hall Rating18.36Very Good: top 25% of ranked beers
More from Untied Brewing Company
See all 207 rated beers| # | Beer | Style | ABV | Ratings | Hall Rating |
|---|---|---|---|---|---|
| 1. | Left In the Dark (BBA With Vanilla) | Stout - Other | 10.2 | 27 | 23.35 |
| 2. | Promises (Root Beer) | Hard Seltzer | 5.6 | 31 | 22.94 |
| 3. | Left In the Dark (BA Coffee & Vanilla) | Stout - Imperial / Double | 10.2 | 37 | 21.88 |