Construction Delay IPA label

Construction Delay IPA by Beardless Brewhaus

IPA - Session · Milton, FL, US · 4.2% ABV

Add to compare

Hall Rating

21.31

All Star. In the top 10% of ranked beers.

Style+

99

1% worse than the average IPA - Session

In-brewery ranking

#6

Ranked #6 of 83 beers from Beardless Brewhaus

ABV

4.2

About as strong as the average IPA - Session (4.34%)

BAR

3.33

Beers Above Replacement, before the small-sample boost

OPS+

5.79

BAR plus a quality bonus that grows with popularity

Untappd rating

3.58

From 11 ratings

How this Hall Rating is built

Read how we rate
Better than the style floor2.51wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume6.67log of ratings (1.04) plus a boost that shrinks as a beer gets popular
Style scale1.272Puts every style on the same scale, so a perfect beer scores 15
Hall Rating21.31All Star: top 10% of ranked beers

More from Beardless Brewhaus

See all 83 rated beers
#BeerStyleABVRatingsHall Rating
1.Peanut Butter PorterPorter - American5.81722.11
2.Tropical AggressionIPA - American6.91021.94
3.Five Year Imperial StoutStout - Imperial / Double9.91021.92