
Six Months Behind Schedule (2024) by Sofia Electric Brewing
Hall Rating
17.36
Above Average. In the top half of ranked beers.
ABV
10.0
About as strong as the average Stout - Imperial / Double (10.68%)
BAR
7.97
Beers Above Replacement, before the small-sample boost
OPS+
12.29
BAR plus a quality bonus that grows with popularity
Untappd rating
3.94
From 336 ratings
How this Hall Rating is built
Read how we rateBetter than the style floor1.81wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume5.50log of ratings (2.53) plus a boost that shrinks as a beer gets popular
Style scale1.742Puts every style on the same scale, so a perfect beer scores 15
Hall Rating17.36Above Average: top half of ranked beers
More from Sofia Electric Brewing
See all 116 rated beers| # | Beer | Style | ABV | Ratings | Hall Rating |
|---|---|---|---|---|---|
| 1. | Pineapple Wonders | Hard Seltzer | 5.0 | 102 | 23.00 |
| 2. | KANAAL 9 YEARS DOUBLE RASPBERRY SHAKE DOUBLE IPA | IPA - Imperial / Double New England / Hazy | 9.0 | 23 | 22.98 |
| 3. | Sneaky Drongo | Bock - Eisbock | 19.0 | 55 | 21.78 |