Six Months Behind Schedule (2025) label

Six Months Behind Schedule (2025) by Sofia Electric Brewing

Stout - Imperial / Double · Sofia, Sofia City Province Bulgaria · 10.0% ABV

Add to compare

Hall Rating

17.45

Above Average. In the top half of ranked beers.

Style+

96

4% worse than the average Stout - Imperial / Double

In-brewery ranking

#60

Ranked #60 of 116 beers from Sofia Electric Brewing

ABV

10.0

About as strong as the average Stout - Imperial / Double (10.68%)

BAR

8.82

Beers Above Replacement, before the small-sample boost

OPS+

13.36

BAR plus a quality bonus that grows with popularity

Untappd rating

3.92

From 674 ratings

How this Hall Rating is built

Read how we rate
Better than the style floor1.79wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume5.60log of ratings (2.83) plus a boost that shrinks as a beer gets popular
Style scale1.742Puts every style on the same scale, so a perfect beer scores 15
Hall Rating17.45Above Average: top half of ranked beers

More from Sofia Electric Brewing

See all 116 rated beers
#BeerStyleABVRatingsHall Rating
1.Pineapple WondersHard Seltzer5.010223.00
2.KANAAL 9 YEARS DOUBLE RASPBERRY SHAKE DOUBLE IPAIPA - Imperial / Double New England / Hazy9.02322.98
3.Sneaky DrongoBock - Eisbock19.05521.78