Critical Path label

Critical Path by Cerebral Brewing

IPA - New England / Hazy · Denver, CO, US · 6.8% ABV

Add to compare

Hall Rating

18.91

Very Good. In the top 25% of ranked beers.

Style+

106

6% better than the average IPA - New England / Hazy

In-brewery ranking

#267

Ranked #267 of 637 beers from Cerebral Brewing

ABV

6.8

About as strong as the average IPA - New England / Hazy (6.29%)

BAR

7.67

Beers Above Replacement, before the small-sample boost

OPS+

12.08

BAR plus a quality bonus that grows with popularity

Untappd rating

4.08

From 166 ratings

How this Hall Rating is built

Read how we rate
Better than the style floor2.06wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume5.47log of ratings (2.22) plus a boost that shrinks as a beer gets popular
Style scale1.678Puts every style on the same scale, so a perfect beer scores 15
Hall Rating18.91Very Good: top 25% of ranked beers

More from Cerebral Brewing

See all 637 rated beers
#BeerStyleABVRatingsHall Rating
1.Proof of ConceptWild Ale - American6.51025.26
2.Wicked SmartIPA - New England / Hazy8.51025.22
3.Brain Wash - Pineapple Coconut TangerineHard Seltzer4.81924.63