
Critical Path by Mosaic Brewing Co
Hall Rating
15.54
Useful to Average. In the bottom half of ranked beers.
ABV
6.5
About as strong as the average IPA - New England / Hazy (6.29%)
BAR
5.90
Beers Above Replacement, before the small-sample boost
OPS+
9.38
BAR plus a quality bonus that grows with popularity
Untappd rating
3.71
From 120 ratings
How this Hall Rating is built
Read how we rateBetter than the style floor1.69wOBAR: rating minus the worst widely drunk beer in its style
Adjusted volume5.48log of ratings (2.08) plus a boost that shrinks as a beer gets popular
Style scale1.678Puts every style on the same scale, so a perfect beer scores 15
Hall Rating15.54Useful to Average: bottom half of ranked beers
More from Mosaic Brewing Co
See all 4 rated beers| # | Beer | Style | ABV | Ratings | Hall Rating |
|---|---|---|---|---|---|
| 1. | Gliding On Rollers | IPA - American | 7.2 | 60 | 20.25 |
| 2. | Cape Cod Kasscade Kasscade | IPA - New England / Hazy | 6.2 | 91 | 17.37 |
| 4. | Buster Brown | Brown Ale - English | 4.5 | 98 | 14.44 |